Moyai
Data center accountability for communities that host them.
See Shelby County live
Connecting to the campus
Power management a utility can check
When the grid is under strain, the data center lowers its power use by 30% within minutes. Moyai measures the cut against normal use and publishes the result.
What holds new data centers back, and what Moyai does about it
Power cannot be delivered fast enoughUtilities approve new capacity sooner when they can see measured load data and verified power cuts.
Connecting to the grid takes yearsA data center that provably lowers its use at peak times can connect without waiting for new power lines.
Cooling uses a lot of energy and waterMoyai recommends cooling changes and checks each saving against normal use in the same weather.
Too few electricians and techniciansPaid training for people who live next to the site, tied to the operator's local hiring promise.See the training program →
Public and live
Everyone sees the same record.
–
megawatts drawn right now, of 110 permitted
–
of grid signals answered in time
$0
of grid upgrade costs on household bills