Data center accountability for communities that host them.

The load drops
when the grid asks.

Grid signal30% less power 4 minutes after the signal

Public and live

Everyone sees the same record.

–

megawatts drawn right now, of 110 permitted

–

of grid signals answered in time

$0

of grid upgrade costs on household bills